Paste Backfill Plant at Lady Loretta Mine

PASTE BACKFILL PLANT – XSTRATA ZINCE MINE MT ISA

Under contract to Outotec, this project was for the fabrication, delivery and construction of a Paste Backfill Plant at the Lady Loretta Zinc Mine in Mt Isa.

The project included: fabrication, delivery to site, structural, mechanical, and piping installation onsite for Xstrata Zinc which was completed in June 2013.

This also included all the electrical installation being completed by Stripes Electrical.

It included 5200m2 of steelwork for surface treatment. This was carried out using a 2 and 3 coat paint system. The steelwork included frames, conveyor sections, platforms, chutes, hoppers, tanks, stairs and handrails.

Duration: 7 Months