Paste Backfill Plant at Tritton Copper Mine

[vc_row][vc_column width=”1/1″][vc_row_inner][vc_column_inner][vc_column_text]STRAITS TRITTON COPPER – PASTE BACKFILL PLANT

One of Stripes Engineering’s projects saw the fabrication and mechanical installation of a Paste Backfill Plant at Tritton Copper Mine near Nyngan.

Under contract to Revell Resources, for Straits Resources Tritton Copper, we completed the project successfully, to budget and on time with zero lost time incidents.

The project included:

  • Fabrication of 140Mt of Steel with full QA/QC reporting
  • Delivery to site
  • Site erection
  • Structural, Mechanical and Piping installation onsite

[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/1″][us_separator type=”invisible”][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”1/1″][us_image_slider ids=”252,253,254,255″ arrows=”always” nav=”none” transition=”slide” autoplay=”1″][/vc_column_inner][/vc_row_inner][/vc_column][/vc_row]