
Stripes Engineering supplied fabrication drawings and a 3D Model to SRG for an access tower for their Keepit Dam Upgrade.
Stripes supplied and delivered the fabricated access tower. This tower was used by SRG as personnel/worker access to the wall during the upgrade works.
Numerous other components were supplied including a drill rig platform integrated into the accessway and a large amount of steel formwork.
Onsite installation and modifications were carried out by Stripes Engineering tradesmen as well.